The Brief:
Diversion of existing sewer with new manholes and 7m deep backdrop.
The Challenges:
– City centre environment
– Depth of Temporary Works
The Solution:
– Excavate and construct a 4m deep manhole on the existing sewer. Excavate and lay 600mm diameter drainage pipework and install an external backdrop into the existing 6.9m deep manhole. Backfill the excavation and reinstate carriageway.
Outputs & Benefits:
– Enabling high profile residential Chapel Wharf development to take place.